How much do we know about tomorrow?
The bank will ask about the growth rate, the supplier about the order, the board about the risk. Can you answer with figures?
Rolandas Rakštys · Lecturer · Vytautas Magnus University, Agriculture Academy · Faculty of Bioeconomy Development, Department of Business and Rural Development · [email protected] · ORCID 0000-0003-0299-9930
Chapter 2 “The business planning and evaluation process”, section 2.2 · English translation of v1.0.11 (2026-10-15) · trainer v1.0.2 · 6 parts · ≈ 50 min
Rakštys, R. (2026). Chapter 2. The business planning and evaluation process (English translation of v1.0.11, 2026-10-15). Verslo planavimas ir vertinimas [Business planning and evaluation]. Vytautas Magnus University, Agriculture Academy. https://rakstys.eu/studijos/verslo-planavimas-ir-vertinimas/en/skyriai/ch02/ · CC BY-NC-ND 4.0
Section 2.2 · analytical models and formulas
Choose a formula
Formula (2.1) · CAGR
1 / 7 · Situation
How fast has the company grown?
CAGR compound annual growth rateV₀ initial valueVₙ final valuen number of periods
The manager of a food processing company is preparing a loan application. The growth rate will become the principal assumption of the application, so the bank will ask about it first.
5002020
8202025
Loan application
Revenue in 2025EUR 820 thousand
Growth assumption_____ % a year
Revenue, EUR thousand – the company’s annual reports; a teaching example, the figures match the scale of an average Lithuanian processing company.
Formula (2.1) · CAGR
2 / 7 · Method
Which indicator makes it possible to compare growth across different periods on a single standard?
CAGR compound annual growth rate
Formula (2.1) · CAGR
3 / 7 · Data
Select the cards needed for formula (2.1)
V₀ initial valueVₙ final valuen number of periodsGDP gross domestic product
Formula (2.1) · CAGR
4 / 7 · Calculation
Calculate the compound annual growth rate
CAGR compound annual growth rateV₀ initial valueVₙ final valuen number of periods
SMA simple moving averagek window size – the number of periods in the averageF forecast
The purchasing manager of a trading company has to place the May order with a supplier by the end of the month: too large an order will tie up cash in inventory, too small an order will leave the shelves empty.
January42
February38
March45
April41
May?
Sales, EUR thousand – the company’s sales records; a teaching example.
α smoothing parameterexponential smoothing greater weight to the latest dataF forecastY actual value
The same purchasing manager notices that the moving average is slow to respond to change and wants a forecast that gives more weight to the most recent month.
April forecast43
actual April sales41
May forecast?
EUR thousand – the same sales records; a teaching example.
Formula (2.3) · Smoothing
2 / 8 · Data
Select the cards needed for formula (2.3)
α smoothing parameterF forecastY actual valueSMA simple moving average
The actual figure was 41, yet the forecast fell only from 43 to 42.6. Why?
α smoothing parameter
Formula (2.3) · Smoothing
5 / 8 · What if
How does α change the forecast?
α smoothing parameterF forecast
often 0.1–0.3 in practice
to the new actual figure (41)20 %
to the old forecast (43)80 %
MAY FORECAST42.6
Forecast accuracy · MAE
6 / 8 · Accuracy
Which method should be relied on next quarter?
MAE mean absolute errorY actual figureF forecast
The methods give a figure, but none of them says whether it can be trusted. Accuracy is measured like this: the method is applied to historical data already available, and you see how far it deviated from them.
Month
1
2
3
4
Forecast F
41.0
42.3
41.7
43.0
Actual Y
38
45
41
44
Moving average forecasts and actual figures, EUR thousand – the same sales records.
R² ≈ 0.997. Does this prove that marketing causes revenue growth?
R² coefficient of determination
R² = 1 − Σ(Y − Ŷ)² = 30Σ(Y − Ȳ)² = 9 030 ≈ 0.997 calculated from this example’s data, as in the chapter; the 0.82 mentioned in the chapter is an example of a more usual value, not the result of this example
Formula (2.4) · Regression
7 / 7 · Limitation
How far can the line be extended?
Ŷ forecast value
Ŷ = EUR 393 thousand
within the observed data
R² ≈ 0.997 is suspiciously good: the teaching data are neatly arranged. In reality such a close fit is a warning, not a triumph – regression shows correlation, not causation.
Indicative thresholds of the textbook’s Excel model: up to 15 % – relatively low dispersion, 15–30 % – moderate, above 30 % – high. This is a didactic convention, not a universal norm.
Formulas (2.5)–(2.6) · Scenarios
5 / 7 · Why
Why did the expected value coincide with the base scenario?
E(V) weighted expected value
Formulas (2.5)–(2.6) · Scenarios
6 / 7 · Conclusion
Why is the expected value alone not enough for the board?
E(V) weighted expected valueσ standard deviationCV coefficient of variation
Formulas (2.5)–(2.6) · Scenarios
7 / 7 · Limitation
What happens when the probabilities are asymmetric?
E(V) expected valueσ standard deviationCV coefficient of variation
How far does the value of the project depend on price?
ε elasticity coefficientNPV net present value
Before negotiations with a buyer, the finance director has to know how far the value of the project depends on price: if the dependence is strong, a discount will cost more than it appears to.
base scenarioEUR 10 per unitNPV EUR 500 thousand
→
price −10 %EUR 9 per unitNPV EUR 325 thousand
The model of the same project; a teaching example.
Formula (2.7) · Elasticity
2 / 7 · Data
Select the cards needed for formula (2.7)
ε elasticity coefficientNPV net present value
Formula (2.7) · Elasticity
3 / 7 · Calculation
Calculate the elasticity of NPV with respect to price
What is such an assumption called, and what should be done with it?
load-bearing assumption the assumption on which value depends most
Formula (2.7) · Elasticity
6 / 7 · Why
Why will the discount cost more than it appears to?
ε elasticity coefficientNPV net present value
Formula (2.7) · Elasticity
7 / 7 · Limitation
Why can one not go further than these two points?
ε elasticity coefficientNPV net present value
Choose the price:
Elasticity is a local measure: ε = 3.5 was measured between these two points and does not hold for the whole range of prices. The chapter gives no NPV for other prices, so they are not shown here.
Figures and concepts are taken from the numerical examples in section 2.2 of Chapter 2, from section 2.5 (the Excel model) and from the textbook’s glossary (CAGR, moving average, exponential smoothing, mean absolute error, coefficient of determination, coefficient of variation, elasticity, load-bearing assumption).
Rakštys, R. (2026). Chapter 2. The business planning and evaluation process (English translation of v1.0.11, 2026-10-15). Verslo planavimas ir vertinimas [Business planning and evaluation]. Vytautas Magnus University, Agriculture Academy. https://rakstys.eu/studijos/verslo-planavimas-ir-vertinimas/en/skyriai/ch02/ · CC BY-NC-ND 4.0
These slides are based on the textbook Verslo planavimas ir vertinimas [Business Planning and Evaluation]. The text was translated, structured and visually laid out with the help of artificial intelligence tools (Claude), following the protocol for working with AI and the verification procedures set by the author.
Trainer storyboard
45 screens · click one to go to it
Turn your phone to landscapeThe screens are laid out for a wide screen: in landscape they fill the whole phone screen.